Username
Password
Home
Forgotten Password?
Register Now
Site Map
THE UK CONSTRUCTION INDUSTRY'S MOST UP TO DATE ARTICLE SEARCH |
Search:
Advanced Search
PRESTIGIOUS DUBLIN HOTEL MAKES ENERGY-CONSCIOUS TOSHIBA AC CHOICE
Toshiba Air Conditioning
12/04/2007
The installation of five Toshiba SHRM heat recovery VRF systems at the new Liffey Valley Clarion Hotel Suites apartment block breaks new ground in Dublin. Energy monitoring devices have been installed within the overall installation by Toshiba’s Jubilee Distributor, of twenty-five year’s standing, GT Phelan, so that any of the sixty suites can be individually billed for their own energy consumption, if required. Toshiba interactive central control has been provided that can be viewed on an interface in the building or at the hotel’s main reception.
The fifteen outdoor units combined in groups of three are located on the roof of the five storey block. Seventy-seven ducted indoor units deliver 30 HP per floor, and the system not only provides heating and cooling but can deliver additional energy savings with its heat recovery design.
Derek Phelan explains the system: “the Toshiba controls determine the mode and temperature of any indoor unit and night set-back can be incorporated if required. When the room temperature reaches 10ºC, the Interactive Intelligence system over-rides the card-key and re-programs the controller to provide heat until the room reaches 15ºC. The Toshiba VRF equipment on this project delivers 420 kW of cooling and 470 kW of heating via slim ducted units which are only 210mm high.”
Air is ducted through grilles within the apartments. The grilles are of a special design that combines both the supply and return air flows. The development has been finished to a high standard and the individual Toshiba controls have been fitted with anodized aluminium covers to match the décor.
Email article
Print article
Was this article useful to you?
Recommend it:
Average (0 votes)
View similar articles:
Ducting
,
Hotels
,
Other
People who viewed this article were also interested in
Subject
Supplier
Date Published
Tested from the kick-off
ACO Building Drainage
11/01/2006
The New Convir FL Series of High Performance Fibre-Opti...
Calex Electronics Ltd
27/09/2006
Environmental Chain of Custody Assured
Puhos Board (UK) Limited
28/09/2006
Norbain catalogue gets the thumbs up from customers
Norbain SD Ltd
29/09/2006
The ROTOR and OMNI as illustrated are just two of a sel...
Peerless Designs
29/09/2006
Other articles from Toshiba Air Conditioning
Subject
Date Published
R22 replacement, an industry problem, with a cost effec...
22/05/2008
Toshiba delivers high performance with the aid of The W...
24/04/2008
Toshiba Air Conditioning appoints first dedicated spare...
07/02/2008
Toshiba provides multiple air-conditioning solutions to...
13/12/2007
Toshiba launches next generation of Daiseikai air condi...
23/11/2007
Click here
to report a mis-classified article
Click here
to report an abusive or defamatory article
© CMP information Ltd 2007
Terms and Conditions
Privacy Policy